EESEfficient Energy SolutionsSchedule a call ↗
Luxury resort swimming pool lit up at dusk

LOCAL ENTREPRENEUR. GLOBAL ALLIANCE.

The Age of
Electricity
Is Here.

AI data centers are straining the world’s power grids. That pressure is creating a generational business opportunity.

Build a business helping the places people love use less energy. You bring the local ambition. EES Alliance brings the infrastructure behind you.

Efficient Energy Solutions.Hospitality · Commercial · Industrial
Rows of server racks inside a large data center

THE AI POWER SURGE

AI is consuming the grid.
Efficiency is the answer.

Artificial intelligence runs on electricity, and its appetite is growing faster than power plants and transmission lines can be built. Grids are tightening, capacity prices are climbing and every wasted kilowatt-hour is now worth more than ever.

2×+Global data-center electricity use is set to more than double, from about 415 TWh in 2024 to around 945 TWh by 2030.IEA, Energy and AI
~50%Share of U.S. electricity demand growth to 2030 expected to come from data centers.IEA, Energy and AI
12%Data centers could use up to 12% of all U.S. electricity by 2028, up from 4.4% in 2023.U.S. DOE / Berkeley Lab
11×PJM capacity prices rose from $28.92 to $333.44 per MW-day between 2024/25 and 2027/28, with data centers named as the driver.PJM Interconnection

A typical AI-focused data center uses as much electricity as 100,000 households. The largest now under construction will use 20 times more.IEA, Energy and AI

Illuminated server racks in a data centerPumps, chillers and cooling systems keep every data center running, the same systems EES Partners optimize.

WHY THIS IS EES'S MOMENT

The grid's crisis is
your opportunity.

When electricity becomes scarce and expensive, the fastest, cheapest new capacity is the power facilities stop wasting.

  1. Every kilowatt-hour is worth more.Rising energy and capacity costs shorten payback periods for hotels, resorts, water parks and other commercial facilities.
  2. Efficiency is capacity you can deploy now.No new power plant, no years of permitting. Optimized pumps and motors free up capacity immediately.
  3. Incentives follow the pressure.As grids tighten, utilities and governments put more weight on demand reduction. Many programs reward verified energy savings.
  4. Cooling is the common thread.Data centers, hotels and water parks all depend on pumps and cooling, and that is exactly where EES Partners specialize.
Talk to us about your market ↗

Sources: IEA, Energy and AI (2025) · U.S. DOE / LBNL, 2024 Data Center Energy Report · PJM 2027/28 capacity auction results. These organizations do not endorse or partner with EES.

01 / A CHANGING WORLD

More demand. A different opportunity.

The world needs
more electricity.
And less waste.

The way we power the world is changing. The way we use that power has to change with it.

AI and data centres, electrification, cooling and economic growth are increasing electricity demand. Grid constraints and concerns about affordability make using existing power more productively a commercial priority.

AI & data centresElectrificationCooling demandEnergy security & affordability
“If the world needs dramatically more electricity, why are we allowing so much of the electricity we already generate to be wasted?”

ENERGY & AI INTELLIGENCE

The pressure is rising.
Efficiency is the fastest response.

“Not just generating more power — avoiding waste of what we already have.”

Current signals shaping the energy-efficiency market

REUTERS

Texas puts data-center water use—and grid access—under scrutiny

Texas ordered tougher enforcement of water-use reporting as the state reviews the power and water demands of its fast-growing data-center sector. Noncompliant projects could face permit and grid-connection consequences.

Why this matters for EES

Resource constraints make verified efficiency a business-continuity issue, not simply a sustainability claim.

Read the story ↗
IEA

Global data-center electricity demand set to more than double by 2030

The IEA projects demand rising from about 415 TWh in 2024 to roughly 945 TWh in 2030. AI-optimized data centers are the largest driver, with their demand expected to more than quadruple.

Why this matters for EES

Every avoidable kilowatt-hour in pumps, cooling and water systems preserves scarce capacity for productive growth.

Explore the IEA numbers ↗
REUTERS

Virginia tightens rules in the world’s largest data-center market

Virginia announced a Data Center Accountability Framework focused on transparency and cleaner power as public concern grows around the sector’s energy and environmental impact.

Why this matters for EES

Large energy users increasingly need measurable operating efficiency to earn community and regulatory confidence.

Read the story ↗
REUTERS

U.S. House advances first bill on data-center power costs

The bipartisan Ratepayer Protection Act asks state regulators to consider whether large-load customers should bear the grid-expansion costs created by their demand rather than passing them to households.

Why this matters for EES

When the cost of new capacity becomes visible, reducing existing demand gains immediate financial value.

Read the story ↗
REUTERS

AI could double data-center power and water consumption by 2030

UN researchers warned that rapidly expanding AI infrastructure could double data-center electricity and water consumption this decade without stronger efficiency practices and policy intervention.

Why this matters for EES

Power and water are linked operating systems; optimizing pumps attacks waste on both sides of that equation.

Read the story ↗

Independent reporting and analysis. Sources do not endorse or partner with EES Alliance.

Hotel swimming pool and landscaped hospitality grounds

BEHIND EVERY GREAT GUEST EXPERIENCE

There’s an opportunity
you can’t always see.

02 / THE BUSINESS OPPORTUNITY

Turn wasted energy
into lasting value.

Pumps, motors and HVAC systems can use more electricity than their applications need. For hotels, resorts, water parks, hospitals and factories, that inefficiency becomes an ongoing operating cost.

Your opportunity is to identify the waste, engineer the right solution and demonstrate the difference.

We are not simply selling VFDs — we optimize the entire operating system around what the application actually needs.

  1. UnderstandAssess the application and establish a baseline.
  2. OptimizeEngineer, program and commission VSD control.
  3. VerifyMonitor performance and measure the results.

03 / THE SIGNALS ARE ALREADY HERE

A market moving
in one direction.

Independent evidence of a growing focus on electricity productivity.

IEA / GLOBAL OUTLOOK

The Age of Electricity

The IEA’s World Energy Outlook describes a shift toward electricity across the global economy, placing efficiency alongside the expansion of supply.

Read the outlook ↗Independent market evidence
AI ENERGY MANAGEMENT ALLIANCE

Smarter demand is on the agenda.

Launched on 16 September 2026 by Emerald AI, Google and NVIDIA, the coalition advances flexible data centres that respond to grid conditions.

Read the announcement ↗Independent market evidence
GRUNDFOS / ENERGY EARNINGS

Shared savings.
Real projects.

Piloted in 2020, Grundfos Energy Earnings demonstrates performance-based efficiency. Its hotel case study shows how upgrades can be funded through realized savings.

Explore the hotel case study ↗Independent market evidence

IEA, Google, NVIDIA, Emerald AI, the AI Energy Management Alliance and Grundfos do not endorse or partner with EES. These examples establish market context, not EES project results.

04 / YOUR AMBITION. OUR ALLIANCE.

You don’t have to build
a multinational
to compete like one.

Build the relationships. Develop your market. Deliver meaningful outcomes. Behind you is a global network of technology, knowledge and support.

01

Technology & engineering

EcoPulse technology, engineering methodology and experience, programming, commissioning, monitoring and measurement.

02

Tools to build your business

Technical and commercial training, EES quoting and ROI software, sales systems, case studies and marketing resources.

03

People in your corner

Partner Hub, an AI knowledge resource, supplier relationships, technical support and project-financing development.

05 / HOW THE ALLIANCE WORKS

Independent,
not alone.

Your local business sits at the centre. The Alliance connects the capabilities around it.

Find your place in the Alliance ↗
LOCAL ENTREPRENEURYou.Your market. Your business.
EcoPulse technology
Engineering & support
Training
Software & sales
Supplier relationships
Shared knowledge

06 / KNOWLEDGE THAT TRAVELS

When one Partner wins,
everyone wins.

A lesson learned in South Carolina can help a Partner in Thailand.

A better commissioning approach. A clearer way to demonstrate ROI. A solution to a difficult application. Experience shared through the Alliance helps every Partner build on what came before.

Local experience. Global intelligence.

Water park pools and slides, illustrating commercial aquatic facilities

07 / BETTER OUTCOMES FOR YOUR CUSTOMERS

Keep the experience.
Lose the waste.

From a peaceful resort pool to a busy water park, help customers improve energy productivity while respecting what their operation needs.

  • Reduce electricity consumption
  • Lower operating costs
  • Eliminate wasted energy
  • Measure and verify results

Some projects may be structured through shared savings, reducing the need for large upfront capital. Availability depends on the project and financing arrangements.

ENERGY-EFFICIENCY PROGRAMS DELIVERED FOR

Hard RockFour SeasonsGrand HyattHyatt RegencyMövenpick

ABOUT US / THE PEOPLE BEHIND THE ALLIANCE

The people behind the progress.

Experienced operators, strategists and growth leaders aligned around one goal: helping every Partner build a stronger, more valuable business.

Todd Allender, Founder of EES Alliance

Todd Allender

Founder & Visionary

14 years in the field

Todd leads EES Alliance with a clear mission: help operators and partners build high income, scalable energy efficiency businesses with the right systems and support. He leads overall strategy, partnerships, and long term direction to ensure the company stays focused on sustainable growth and real world results.

Illustrative AI-generated portrait for the Energy Compliance Director role

Energy Compliance Director

Specialist role

Keeps every project aligned with energy codes, efficiency standards and reporting requirements, so customers can verify results with confidence.

Illustrative AI-generated portrait for the Government Rebate Director role

Government Rebate Director

Specialist role

Identifies the utility and government energy-efficiency incentives each project qualifies for and guides Partners through the application process.

Illustrative AI-generated portrait for the New Project Development Officer role

New Project Development Officer

Specialist role

Develops new project opportunities, qualifies facilities and helps Partners structure proposals that are ready to move forward.

Specialist roles shown with AI-generated illustrative portraits until team members are announced.

FREQUENTLY ASKED QUESTIONS

Questions Partners ask.

Why does AI create an opportunity for energy efficiency?

AI data centers are adding electricity demand faster than new power plants and transmission can be built. The IEA expects global data-center electricity use to more than double by 2030, and capacity prices in the largest U.S. grid market have risen more than tenfold. When electricity is scarce and expensive, eliminating waste in pumps, motors and cooling systems becomes one of the fastest and lowest-cost ways to free up capacity and cut costs.

What does an EES Alliance Partner do?

Partners identify wasted electricity in pumps, motors and HVAC systems at hotels, resorts, water parks, hospitals and factories, then engineer, program and commission variable-speed (VSD) control and monitor the results to verify the savings.

What support does EES Alliance provide to Partners?

EcoPulse technology and engineering methodology, technical and commercial training, quoting and ROI software, sales systems and marketing resources, a Partner Hub with an AI knowledge resource, supplier relationships, technical support and project-financing development.

Which facilities benefit most from pump energy optimization?

Water- and energy-intensive operations where pumps and motors run longer or harder than the application needs: resort and hotel pools, water parks, hospitals, commercial buildings and industrial sites.

Is this just selling VFDs?

No. A variable frequency drive is one component. The approach optimizes the whole operating system around what the application actually needs: assess and baseline, optimize and commission, then measure and verify.

Do customers have to pay for upgrades upfront?

Not always. Some projects may be structured through shared savings, reducing the need for large upfront capital. Availability depends on the project and the financing arrangements.

How do I become an EES Alliance Partner?

Schedule a call with the team to talk through your market, the support available and whether the partnership is the right fit.

EFFICIENT ENERGY SOLUTIONS

YOUR NEXT CHAPTER

Local Entrepreneur.
Global Alliance.

The market has changed. The opportunity is generational.
The question is whether you want to be part of it.

LET’S TALK ABOUT YOUR MARKET

Your next chapter
starts with a conversation.

Explore becoming an EES Alliance Partner, the support available, and the opportunity in your market.

Call booking is coming soon.

Online scheduling is not connected yet. Please return once the EES booking calendar is available.